• 杜兰特已封神!蝉联FMVP超詹皇变成联盟第一人? 2019-10-21
  • 纪念马克思诞辰200周年 2019-10-21
  • 《对话·寓言2047》第二季在京首演 张艺谋玩起艺术与科技的碰撞 2019-10-14
  • 河北永清:小麦丰收 秸秆变宝 2019-10-13
  • 天如果能降人柴,还不如直接降想要的物品得了~ 2019-10-13
  • 徐祥楠当选为中国家具协会六届理事会理事长 2019-09-30
  • 苗山脱贫影像志——父母在 不远行 2019-09-29
  • (原创首发)退休政策研究的削足适履 2019-09-29
  • 红色文化讲习所 廿四小时不打烊 2019-09-26
  • 云南女子饲养小猴子5年 竟是国家一级保护动物熊猴 2019-09-22
  • 俄罗斯驻华大使:未来上合的首要任务是加强区域一体化 2019-09-22
  • 安徽省直机关领导干部宪法学习宣传报告会br暨“省直机关大讲堂”第四十四讲在肥举办 2019-09-14
  • 动车票价下浮折扣凸显为民情怀 2019-09-11
  • 回复@笑傲江湖V:蠢货!就算用刷点软件也是有成本的啊,一个点击一分钱,也得七十多万,咱钱再多也不会这么烧吧? 2019-09-11
  • 法国:巴黎发生劫持人质事件   2019-09-08
  • CN DE
    The First Fast-Charging Hub Station Started Operation in Shanghai
    May 29, 2018

    HUZHOU, China and STAFFORD, Texas, May 30, 2018 –The very first fast-charging hub station in the city of Shanghai, with 20 full electric buses equipped with Microvast fast-charging battery systems, started its operation in Pudong, Shanghai, China.

    “It is the first fast-charging hub station in Shanghai. The mode of ‘fast charging combined with slow charging’ will further increase the utilization of the charging pile as well as the efficiency of operation.” said by a manager of Pudong Public Transport Company.

    图片 2.png

    Launching Ceremony of the Fast-Charging Hub Station in Shanghai

    The twenty electric buses with Microvast MpCO fast-charging battery systems can be fully charged in 10-15 minutes during the driver breaks at end stations, which allows the electric buses to operate through a full day similar to internal combustion engine (ICE) powered buses. The fast charging operational mode enables those buses to run as efficiently as ICE buses, which is the key factor that operators are looking for when considering operation profit.

    图片 1.png

    E-bus with Microvast Fast Charging Batteries in Shanghai

    Shanghai has been looking for e-solutions in public transport for years. It is the first time that operators made the decision to go to fast-charging, not only for higher operational efficiency, but also for lower land requirements of charging stations. As one of the most expensive cities in China, Shanghai is limited in lands that can provide enough space for slow charging electric buses which need to be recharged overnight. This is not only the problem for Shanghai, but for most big cities in the world.

    The fast-charging hub station is located on Lingang Avenue, Pudong District. With 240kWchargers and Microvast fast charging battery systems, the vehicle can be fully charged in a short gap time and be ready to go again in 15-20 minutes, which further improves the utilization of charging piles and solves operational problems such as difficult scheduling caused by traditional slow charging.

    图片 3.png

      E-bus with Microvast Fast Charging Battery System Charged at the Station

    With years of experience with slow charging and battery swapping, Shanghai fully understands the benefits of fast charging. The operation of the charging station will surely be a signpost that shows the future direction of the city in the public transport sector.

    About Microvast

    Microvast is a fast-growing and profitable market leader in the design, development and manufacturing of fast charging, long-life, and non-flammable lithium-ion battery systems. Established in 2006, Microvast was founded with a vision to address current constraints in electric vehicle development and to redesign power systems to drive mass adoption of electric vehicles. The company has supplied more than 22,000 hybrid and fully electric buses with battery systems, operating in more than 150 cities across 13 countries with over two billion kilometers traveled. Microvast is headquartered in Stafford, Texas (USA) and Zhejiang, China, with offices in the UK and Germany. More information is available at 广东快乐10分开奖结果

    About Clean City Transit

    Clean City Transit plan, or the CCT plan, is Microvast’s primary business strategy. The CCT plan aims to assist in the electrification of urban transportation systems by progressively introducing Microvast’s power battery systems, first to city buses, then to taxis and finally to passenger cars.

    CONTACT

    Public Relations

    Janet Wu, [email protected], Tel: +86 572 2756 888

  • 杜兰特已封神!蝉联FMVP超詹皇变成联盟第一人? 2019-10-21
  • 纪念马克思诞辰200周年 2019-10-21
  • 《对话·寓言2047》第二季在京首演 张艺谋玩起艺术与科技的碰撞 2019-10-14
  • 河北永清:小麦丰收 秸秆变宝 2019-10-13
  • 天如果能降人柴,还不如直接降想要的物品得了~ 2019-10-13
  • 徐祥楠当选为中国家具协会六届理事会理事长 2019-09-30
  • 苗山脱贫影像志——父母在 不远行 2019-09-29
  • (原创首发)退休政策研究的削足适履 2019-09-29
  • 红色文化讲习所 廿四小时不打烊 2019-09-26
  • 云南女子饲养小猴子5年 竟是国家一级保护动物熊猴 2019-09-22
  • 俄罗斯驻华大使:未来上合的首要任务是加强区域一体化 2019-09-22
  • 安徽省直机关领导干部宪法学习宣传报告会br暨“省直机关大讲堂”第四十四讲在肥举办 2019-09-14
  • 动车票价下浮折扣凸显为民情怀 2019-09-11
  • 回复@笑傲江湖V:蠢货!就算用刷点软件也是有成本的啊,一个点击一分钱,也得七十多万,咱钱再多也不会这么烧吧? 2019-09-11
  • 法国:巴黎发生劫持人质事件   2019-09-08
  • 打麻将规则打法 重庆时时彩龙虎和秘诀 欢乐二人雀神游戏 足球直播360 赛车北京pk10稳计划 极速快三免费辅助软件 龙虎赢钱实战技巧 后三混合组选包胆玩法 一品娱乐注册 河北时时11选五开奖结果查询结果